CMF / CRF Details

CMF ID: 10024

Implement Active Traffic Management Strategies

Description: Implement a combination of Advisory Variable Speed Limits and Lane Use Control Signs on a section of interstate.

Prior Condition:  Interstate segment with static speed limits and no lane use control signals.

Category: Advanced technology and ITS

Study: Evaluation of the Impact of the I-66 Active Traffic Management System: Phase II, Dutta et al., 2018

 
Star Quality Rating:3 Stars  [View score details]
Rating Points Total:85
Crash Modification Factor (CMF)
Value:1.127
Adjusted Standard Error:
Unadjusted Standard Error:0.094
Crash Reduction Factor (CRF)
Value:-12.7  (This value indicates an increase in crashes)
Adjusted Standard Error:
Unadjusted Standard Error:9.4
Applicability
Crash Type:Multiple vehicle
Crash Severity:All
Roadway Types:Principal Arterial Interstate
Street Type:
Minimum Number of Lanes:6
Maximum Number of Lanes:8
Number of Lanes Direction:
Number of Lanes Comment:
Crash Weather:Not specified
Road Division Type:Divided by Median
Minimum Speed Limit:
Maximum Speed Limit:
Speed Unit:
Speed Limit Comment:
Area Type:Suburban
Traffic Volume:Minimum of 167000 to Maximum of 184000 Annual Average Daily Traffic (AADT)
Average Traffic Volume:176667 Annual Average Daily Traffic (AADT)
Time of Day:All
If countermeasure is intersection-based
Intersection Type:
Intersection Geometry:
Traffic Control:
Major Road Traffic Volume:
Minor Road Traffic Volume:
Average Major Road Volume :
Average Minor Road Volume :
Development Details
Date Range of Data Used:2011 to 2016
Municipality:
State:VA
Country:United States
Type of Methodology Used:Before/after using empirical Bayes or full Bayes
Sample Size (crashes):636 crashes before, 186 crashes after
Sample Size (sites):3 sites before, 3 sites after
Sample Size (site-years):12 site-years before, 3 site-years after
Sample Size (miles):5.8 miles before, 5.8 miles after
Sample Size (miles):23.2 mile-years before, 5.8 mile-years after
Other Details
Included in Highway Safety Manual?No
Date Added to Clearinghouse:Jul 26, 2019
Comments:Applies to a segment with advisory variable speed limits and lane use control signals.